Show jPlayer Inspector
jPlayer events that have occurred over the past 1 second: (Backgrounds: Never occurred Occurred before Occurred Multiple occurrences reset )
ready (0)
setmedia (0)
flashreset (0)
resize (0)
repeat (0)
click (0)
warning (0)
loadstart (0)
progress (0)
timeupdate (0)
volumechange (0)
error (0)
play (0)
pause (0)
waiting (0)
playing (0)
seeking (0)
seeked (0)
ended (0)
loadeddata (0)
loadedmetadata (0)
canplay (0)
canplaythrough (0)
suspend (0)
abort (0)
emptied (0)
stalled (0)
ratechange (0)
durationchange (0)
Update jPlayer Inspector
The difference between strategy and continuous improvement
Gary Harpst joins Jim Blasingame to explain the difference between executing strategy, which comes from top down, and continuous improvement which is identified from front line employees.